Wednesday, November 25, 2009

Gas Tank & Fire Extinguisher Mounts

Because it was a short week due to the Thanksgiving holiday, we didn't get a lot done but Rich got the gas tank mount made and installed. The tank has to be easily removed by the inspectors at the competition. Rich and I also figured out where to mount the fire extinguisher and he got the bracket made and welded on for it. The extinguisher is mounted so that if there is a fire in the engine compartment, all the driver has to do is pull the pin and squeeze the handle. The dry chemical powder goes through a hose and comes out a nozzle aimed at the engine and carburetor. Mr. Mengel is going to pick up the hose this weekend for us.

Saturday, November 14, 2009

Trying It On For Size






This past week we have shown progress. Now that the rear of the canopy is in place, Rich fastened the windshield on the car. As shown in the picture, I laid in the car to make sure visibility was good. It also helps that I am significantly bigger than Tyler, our driver, so me being able to fit insures he will fit comfortably. Since Tyler is not in our class, it is hard to get exact measurements, however, we will make do. Our drafters are making progress on our drawings, as well as Sam who is writing our proposal.

Sunday, November 8, 2009

Update

These past couple of weeks we have done more on the paperwork than on the actual car. This is important though, without the paper work we cannot compete. Our proposal is due January 22nd. Sam is working on this now, since he did it last year, it should be easiest for him. In the meantime, Dillon is working on the CAD drawings for the proposal.

Right now Rich is working on some sheet metal. He is making a firewall and when we get another sheet of aluminum, he'll finish the floor. In the meantime, he will continue to make parts like the gas tank mount.